{"id":2426,"date":"2023-07-03T11:27:57","date_gmt":"2023-07-03T10:27:57","guid":{"rendered":"https:\/\/localhost\/keralaenergy\/?p=2426"},"modified":"2023-09-21T11:17:30","modified_gmt":"2023-09-21T10:17:30","slug":"led-testing-lab","status":"publish","type":"post","link":"https:\/\/keralaenergy.gov.in\/?p=2426","title":{"rendered":"LED Testing Lab"},"content":{"rendered":"<p>EMC is setting up a complete LED Test setup with the help of Central Power Research Institute, Bengaluru.<br \/>\nThe following test setup has been purchased and some of the equipment are to be commissioned.<\/p>\n<p>1. Integrated Sphere<br \/>\n2. Geneophotometer<br \/>\n3. Glow wire test apparatus<br \/>\n4. Endurance test High temp (45oC) Life test system cum Switching cycle test system<br \/>\n5. Dimension Check<br \/>\n6. Ball Pressure Test Unit<br \/>\n7. Torsion Test Equipment<br \/>\n8. Axial Pull Test Apparatus<br \/>\n9. Bending Test<br \/>\n10. Electric Shock Test Unit<br \/>\n11. Deep Freezer<br \/>\n12. Hot air Oven<br \/>\n13. Cap Temp Rise Test Equipment for LED Lamps<br \/>\n14. Humidity Chamber<br \/>\n15. LISN<\/p>\n<p>The equipment recalibration process and NABL Accreditation procedure is going on at LED Testing Lab of Energy Management Centre Kerala.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EMC is setting up a complete LED Test setup with the help of Central Power Research Institute, Bengaluru. The following [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[73],"tags":[],"class_list":["post-2426","post","type-post","status-publish","format-standard","hentry","category-infrastructure"],"_links":{"self":[{"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/posts\/2426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2426"}],"version-history":[{"count":2,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/posts\/2426\/revisions"}],"predecessor-version":[{"id":2640,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=\/wp\/v2\/posts\/2426\/revisions\/2640"}],"wp:attachment":[{"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/keralaenergy.gov.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}