{"id":4130,"date":"2026-03-06T10:48:46","date_gmt":"2026-03-06T10:48:46","guid":{"rendered":"\/?p=4130"},"modified":"2026-09-10T05:53:56","modified_gmt":"2026-09-10T04:53:56","slug":"tender-2026","status":"publish","type":"post","link":"\/?p=4130","title":{"rendered":"Tender 2026"},"content":{"rendered":"<ul>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/Notice-Inviting-quotation-for-the-calibration.pdf\" target=\"_blank\" rel=\"noopener\">Inviting quotation for the calibration of source meter MT781 &amp; MTi300 of Energy Meter Calibration Laboratory (onsite)<\/a><\/li>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/document-2026-08-14T165544.684.pdf\" target=\"_blank\" rel=\"noopener\">Quotation Invited for Design, Execution, Installation and Presentation of Onam Float 2026<\/a><\/li>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/NIQ-EMCL-Calbration-of-Master-Equipment-MT781.pdf\" target=\"_blank\" rel=\"noopener\">Notice Inviting quotation for the calibration of source meter MT781 of Energy Meter Calibration Laboratory (onsite)<\/a><\/li>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/Notice-For-Empanelment-of-Printing-Works.pdf\" target=\"_blank\" rel=\"noopener\">Notice inviting for Empanelment of Printing Works<\/a><\/li>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/Taxi-Empanelment-documents-13.07.2026.pdf\" target=\"_blank\" rel=\"noopener\">Notice for Empanelment of Taxi services (A\/C, NON-A\/C &amp; EV) to Energy Management Centre (EMC) on daily basis for the period upto 30.06.2027<\/a><\/li>\n<li>\n<div><i><a href=\"\/wp-content\/uploads\/2026\/03\/NIQ-recalibration-of-equipments-at-EMCL.pdf\" target=\"_blank\" rel=\"noopener\">Notice Inviting Quotations: calibration of Laboratory equipments&#8221; at Energy Meter Calibration Laboratory of Energy Management Centre- Kerala&#8221;<\/a>&#8220;<\/i><\/div>\n<\/li>\n<li><a href=\"\/wp-content\/uploads\/2026\/03\/eTender-for-house-keeping-services-at-EMC.pdf\" target=\"_blank\" rel=\"noopener\">Notice inviting Tender for the Housekeeping Service for the Building of Energy Management Centre<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Inviting quotation for the calibration of source meter MT781 &amp; MTi300 of Energy Meter Calibration Laboratory (onsite) Quotation Invited for [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[94],"tags":[],"class_list":["post-4130","post","type-post","status-publish","format-standard","hentry","category-tender"],"_links":{"self":[{"href":"\/index.php?rest_route=\/wp\/v2\/posts\/4130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4130"}],"version-history":[{"count":10,"href":"\/index.php?rest_route=\/wp\/v2\/posts\/4130\/revisions"}],"predecessor-version":[{"id":4269,"href":"\/index.php?rest_route=\/wp\/v2\/posts\/4130\/revisions\/4269"}],"wp:attachment":[{"href":"\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4130"},{"taxonomy":"post_tag","embeddable":true,"href":"\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}